Skip to main content
Basic Technical IVT Commonly tested

Geotechnical Settlement

noun

Pronunciation: /ˌdʒiːoʊtɛkˈnɪkəl ˈsɛtəlmənt/

The subsidence or vertical displacement of ground surface caused by compaction, collapse, or consolidation of underlying geological materials in mined-out voids or weakened structures. This movement poses risks to surface infrastructure and requires engineering controls during abandoned mine reclamation.

Plain English

Ground sinking downward due to loose or collapsing materials beneath the surface after mining stops.

Etymology & History

Origin languageGreek/English
Rootgeo (Greek ge, earth) + technical (Greek technikos, craft) + settlement (Old French settler, to settle)
First recorded use1970s
Usage frequencyCommon

Usage

"Geotechnical settlement assessments indicated that the abandoned mine posed subsidence risks to properties within 500 meters of the shaft collar."

Style guide notes: Distinguish between uniform and differential settlement; specify magnitude and rate when discussing impacts.

Also known as

subsidence ground settlement differential settlement

Contrasted with

ground stability structural integrity

Related Terms

Frequently Asked Questions

What causes geotechnical settlement in abandoned mines?

Collapse of pillars, consolidation of tailings, compression of backfill, and water-induced weakening create subsurface voids and ground movement.

How is settlement risk managed in reclamation?

Solutions include backfilling voids, pillar stabilization, surface capping, subsidence monitoring, and building restrictions in high-risk zones.

Why Test Candidates on This?

Essential for site characterization and reclamation design to protect public safety and property in areas adjacent to abandoned mines.

Required skill level: Mid

Editors from these organisations have used our services since 1998

Reuters BBC Oxford University Press Penguin Random House Springer Microsoft Suncor Energy United Nations Fisher Investments IBM The Home Depot KODAK CHEVRON