Skip to main content
Basic Technical IVT Commonly tested

Mine Site Grading Plan

noun

Pronunciation: /maɪn saɪt ˈɡreɪdɪŋ plæn/

A detailed engineering document specifying the final topographic design and earthwork procedures for reshaping an abandoned mine site to achieve stable drainage patterns and slope angles. It includes contour maps, cut-and-fill specifications, and drainage routes.

Plain English

A plan showing how to reshape the land at an abandoned mine for stability, proper drainage, and safe slopes.

Etymology & History

Origin languageEnglish
Rootmine (Old French) + site (Latin situs, location) + grading (from Old French gradus, step) + plan (from Old French)
First recorded use1970s
Usage frequencyCommon

Usage

"The mine site grading plan specified 2% slope grades to ensure surface water runoff away from the backfilled pit while maintaining slope stability."

Style guide notes: Always reference specific slope ratios and drainage percentages when discussing grading plan details in technical reports.

Also known as

final grading design site reshaping plan topographic reclamation plan

Contrasted with

ungraded site natural contours

Related Terms

Frequently Asked Questions

What information is included in a mine site grading plan?

Contour maps, slope specifications, drainage routes, earthwork volumes, equipment requirements, and final surface elevations for approved designs.

Why is proper grading essential for mine reclamation?

Correct grading ensures surface water drains safely, prevents erosion, maintains geotechnical stability, and supports future land uses.

Why Test Candidates on This?

Critical for understanding site design engineering and how reclamation plans achieve physical and hydrological stability objectives.

Required skill level: Mid

Editors from these organisations have used our services since 1998

Reuters BBC Oxford University Press Penguin Random House Springer Microsoft Suncor Energy United Nations Fisher Investments IBM The Home Depot KODAK CHEVRON