Skip to main content
Basic Technical

Overburden Stockpile Reconfiguration

noun

Pronunciation: /ˌoʊvərˈbɜrdən ˈstɑkˌpaɪl ˌrekənfɪɡəˈreɪʃən/

The process of reshaping and redistributing excavated rock and soil removed during mining (overburden) to achieve stable slopes, improved drainage, and site contours suitable for reclamation activities. This involves grading, compaction, and integration of materials to reduce erosion and support vegetation establishment.

Plain English

Reshaping piles of excavated rock and soil left from mining to create stable, properly-drained landforms.

Etymology & History

Origin languageEnglish
Rootoverburden (over + burden) + stockpile (stock + pile) + reconfiguration (re- + configure + -tion)
First recorded use1990s
Usage frequencyCommon

Usage

"The limestone quarry's closure plan prioritized overburden stockpile reconfiguration to create safe slope angles and surface drainage patterns."

Style guide notes: Distinguish between 'reconfiguration' (reshaping existing materials) and 'recontouring' (achieving final landform design).

Also known as

stockpile reshaping overburden grading material redistribution

Contrasted with

pile abandonment uncontrolled stockpiling

Related Terms

Frequently Asked Questions

Why reconfigure overburden stockpiles during reclamation?

Reconfiguration improves slope stability, reduces erosion, enhances surface drainage, and prepares sites for productive reuse.

What equipment is used for stockpile reconfiguration?

Dozers, graders, excavators, and compactors are commonly deployed to reshape and compact overburden materials.

Why Test Candidates on This?

Relevant for understanding physical reclamation construction and site preparation methodologies.

Required skill level: Mid

Editors from these organisations have used our services since 1998

Reuters BBC Oxford University Press Penguin Random House Springer Microsoft Suncor Energy United Nations Fisher Investments IBM The Home Depot KODAK CHEVRON