Tailings Dam Breaching Protocol

noun

Pronunciation: /ˈteɪlɪŋz dæm ˈbriːtʃɪŋ ˈproʊtəˌkɔːl/

A structured procedure for safely removing or modifying tailings dams during abandonment to prevent catastrophic failure while releasing impounded material in a controlled manner. Protocols include geotechnical assessment, staged deconstruction, and downstream impact management.

Plain English

A controlled plan for safely dismantling tailings storage dams to prevent sudden failure and environmental disaster.

Etymology & History

Origin languageEnglish
Roottailings (tail) + dam (Middle Low German) + breaching (Old French breche) + protocol (Greek protos + Latin collum)
First recorded use2010s
Usage frequencyRare

Usage

"The mining company developed a comprehensive tailings dam breaching protocol approved by state environmental regulators."

Style guide notes: Reference specific regulatory requirements when discussing protocols; emphasize stakeholder notification and environmental safeguards.

Also known as

dam decommissioning procedure tailings containment removal protocol staged dam deconstruction

Contrasted with

dam abandonment-in-place permanent impoundment

Related Terms

Frequently Asked Questions

What risks does tailings dam breaching protocol address?

Protocols prevent catastrophic dam failures, downstream flooding, and uncontrolled contaminant release during abandonment.

Who approves tailings dam breaching protocols?

State environmental agencies, dam safety officials, and sometimes federal regulators approve these specialized procedures.

Why Test Candidates on This?

Critical expertise area for large-scale mine closure projects with significant storage structures.

Required skill level: Expert