Skip to main content
Basic Technical IVT Commonly tested

Tailings Pond Closure

noun

Pronunciation: /ˈteɪlɪŋz pɑnd ˈkloʊʒər/

The process of sealing, dewatering, and stabilizing surface impoundments containing mining byproducts to prevent contaminant release and erosion. This involves constructing stable covers, drainage systems, and long-term monitoring infrastructure.

Plain English

The process of safely sealing and securing the large water-filled basins used to store mining waste.

Etymology & History

Origin languageEnglish
Roottailings (mining refuse) + pond (small water body) + closure (Latin claudere, to close)
First recorded use1980s
Usage frequencyVery common

Usage

"The tailings pond closure project included constructing a clay-geotextile cover system and installing groundwater monitoring wells."

Style guide notes: Specify pond location and size when referencing specific closure projects.

Also known as

tailings impoundment closure tailing facility reclamation

Contrasted with

tailings pond expansion

Related Terms

Frequently Asked Questions

What is the typical timeframe for a tailings pond closure project?

Projects typically require 2-5 years of construction plus 10-30 years of post-closure monitoring.

What materials are used to close tailings ponds?

Clay liners, geotextiles, soil covers, and synthetic membranes create impermeable barriers.

Why Test Candidates on This?

Essential for evaluating containment engineering and risk reduction capabilities.

Required skill level: Senior

Editors from these organisations have used our services since 1998

Reuters BBC Oxford University Press Penguin Random House Springer Microsoft Suncor Energy United Nations Fisher Investments IBM The Home Depot KODAK CHEVRON