Skip to main content
Basic Technical IVT Commonly tested

Void Space Management

noun

Pronunciation: /vɔɪd speɪs ˈmænɪdʒmənt/

The strategic approach to handling empty underground cavities and excavated spaces in abandoned mines to prevent collapse, control water accumulation, and ensure long-term stability. Methods include selective backfilling, water pooling, or engineered capping.

Plain English

Techniques used to safely manage empty spaces left behind in abandoned mines to prevent dangers and environmental problems.

Etymology & History

Origin languageEnglish
Rootvoid (from Old French vuide, empty) + space (from Latin spatium) + management (from manage)
First recorded use1980s
Usage frequencyCommon

Usage

"Void space management in the underground workings required a combination of partial backfill and water level stabilization."

Style guide notes: Use in context of underground stability; distinguish from surface crown pillar management.

Also known as

cavity management underground space control void filling

Contrasted with

open excavation surface exposure

Related Terms

Frequently Asked Questions

Why is void space management important in mine reclamation?

It prevents underground collapses that cause sinkholes, controls water accumulation causing AMD, and ensures site stability.

What are common void space management techniques?

Selective backfilling, water pooling behind engineered barriers, and monitored subsurface stabilization are primary methods.

Why Test Candidates on This?

Common in geotechnical and mine closure engineering assessments.

Required skill level: Mid

Editors from these organisations have used our services since 1998

Reuters BBC Oxford University Press Penguin Random House Springer Microsoft Suncor Energy United Nations Fisher Investments IBM The Home Depot KODAK CHEVRON