peak demand
The maximum momentary load placed on a water or wastewater plant or pumping station or on an electric generating plant or system. This is usually the maximum average load in one hour or less, but may be specified as instantaneous or with some other short time period.
peak demand is part of the Energy Demand Response editor test terminology.